The Day’s Play Edition 86: Gold resource growth, new discoveries and record drilling results | STN, DRE, 49M

The Day’s Play Edition 86: Gold resource growth, new discoveries and record drilling results | STN, DRE, 49M

June 3, 2026 Off By MarketOpen

THE COIN TOSS

STN – Saturn Metals added 590,000oz to Apollo Hill, lifting the gold inventory to 2.83Moz and increasing higher confidence resources to 2.19Moz.

DRE – Dreadnought Resources confirmed a new gold discovery beyond the interpreted limits of Metzke’s Find, extending mineralisation northward and at depth.

49M – 49 Metals delivered the strongest Gold Mountain intercept on record, returning 27.4m @ 8.3g/t Au including 9.1m @ 21.9g/t Au.

PHO – PhosCo uncovered a significant new phosphate discovery at DOH, defining mineralisation across a 1.3km strike and more than 600m width.

SMX – Strata Minerals expanded the Zelica gold system with a 94% drilling hit rate and mineralisation confirmed across multiple stacked lodes.

MDI – Middle Island Resources connected previously separated mineralised zones at Bobija, supporting a broader continuous mineralised system.

MM8 – Medallion Metals validated 212 historical drill holes, confirming gold continuity across more than 1km of strike and 466m of depth.

HTM – High Tech Metals confirmed Wagtail as a free milling gold deposit with recoveries of up to 97.2% from conventional processing routes.

IBR – Iron Bear Resources lodged for Project of National Significance status under Canada’s new federal approvals framework.

LMS – Litchfield Minerals strengthened the Oonagalabi copper zinc system with broad mineralised intersections and confirmed continuity across the Main Zone.

GA8 – GoldArc Resources confirmed a continuous ore envelope across Mt Stirling’s eastern sector through multiple high grade grade control results.

Saturn Metals (ASX:STN)

Apollo Hill Resource Grows 26% To 2.83Moz

The Play

  • Apollo Hill Mineral Resource increased 26% to 2.83Moz from the previous estimate.
  • The update added 590,000oz of contained gold to the resource.
  • Measured and Indicated Resources increased by 350,000oz to 2.19Moz.
  • Higher confidence Measured and Indicated categories now represent 77% of the resource.
  • The updated estimate incorporated 367 drill holes totalling 62,385m.

The Pitch

  • Apollo Hill hosts a Mineral Resource of 174Mt @ 0.51g/t Au for 2.83Moz.
  • The project is 100% owned and located near Leonora in Western Australia.
  • The resource is reported within a single open pit constraining shell.
  • Indicated Resources total 129Mt @ 0.51g/t Au for 2.10Moz.
  • Measured Resources total 4.9Mt @ 0.55g/t Au for 87,000oz.

The Next Overs

  • Apollo Hill Definitive Feasibility Study is targeted for release in late CY2026.
  • An updated Apollo Hill Ore Reserve is targeted for release in late CY2026.
  • Drilling continues to target near surface and lateral resource extensions.

Read full ASX Announcement here.

Dreadnought Resources (ASX:DRE)

New Gold Discovery Extends Beyond Resource Boundary

The Play

  • New gold discovery confirmed north of Metzke’s Find across 150m strike.
  • Discovery remains open northward and at depth following initial drilling.
  • Mineralisation extends beyond a dyke previously interpreted as deposit termination.
  • Resource extension drilling returned significant gold intercepts outside the current resource.
  • Remaining 34 assays completed the 57 hole RC drilling program.

The Pitch

  • Illaara Gold Project spans approximately 800km² across a 70km greenstone belt.
  • Dreadnought holds 100% ownership of the Illaara Gold Project.
  • Metzke’s Find hosts a 14,900 oz gold resource grading 6.8 g/t.
  • Current resource contains 72% Indicated material within shallow mineralisation.
  • Gold mineralisation occurs within stacked quartz lodes hosted by mafic sequences.

The Next Overs

  • Resource update and upgrade scheduled for July 2026.
  • Updated study follows completion of the resource update.
  • RC and diamond drilling resumes at Metzke’s Find in July.

Read full ASX Announcement here.

49 Metals (ASX:49M)

Highest Grade Gold Mountain Intercept Returned To Date

The Play

  • DRC#9 returned 27.4m @ 8.3g/t Au from 221.0m.
  • The 227 gram metre intercept is the highest recorded at Gold Mountain.
  • The interval included 9.1m @ 21.9g/t Au from 224.0m.
  • A second mineralised zone returned 25.9m @ 1.4g/t Au from 158.5m.
  • The high grade zone remains open at depth and in all directions.

The Pitch

  • Gold Mountain is located within the Walker Lane Trend in Nevada.
  • The project hosts a low sulphidation epithermal gold silver system.
  • DRC#9 was drilled from the same collar location as DRC#8.
  • Both holes intersected broad zones of oxide gold mineralisation.
  • The deeper high grade zone occurs at a vertical depth of 200m.

The Next Overs

  • Assays remain pending for completed holes DRC#10 to DRC#13.
  • Additional drill pads are being constructed at the Adit Zone.
  • Further drilling will test extensions to the high grade mineralisation.

Read full ASX Announcement here.

The Day's Play Sponsor - MPH Lawyers

PhosCo (ASX:PHO)

DOH Discovery Adds Significant New Phosphate Scale At Gasaat

The Play

  • Drilling confirmed DOH as a new phosphate discovery within the Gasaat Project.
  • The phosphate horizon averaged 13m thickness across the drilled area.
  • Mineralisation extends over a 1.3km strike length and more than 600m width.
  • Multiple DOH drill holes returned phosphate intercepts exceeding 10m at approximately 20% P₂O₅.
  • Results were consistent with phosphate mineralisation encountered across Gasaat.

The Pitch

  • Gasaat hosts widespread marine carbonate hosted sedimentary phosphate mineralisation.
  • DOH is a down faulted or slump block located east of GK.
  • The prospect is between 600m and 750m wide and more than 1,300m long.
  • The phosphate horizon occurs between Cretaceous marls and Eocene limestone.
  • Seven drill holes have been completed at DOH to date.

The Next Overs

  • Infill and extension drilling will be completed at DOH.
  • Further drilling will define mineralisation extent ahead of resource estimation.
  • Additional Gasaat drilling results are expected shortly.

Read full ASX Announcement here.

Strata Minerals (ASX:SMX)

Phase 2 Drilling Expands Zelica Multi Lode Gold System

The Play

  • Phase 2 drilling intersected significant gold mineralisation in 16 of 17 extension holes.
  • Stacked hanging wall lodes were confirmed across multiple drill sections.
  • Additional drilling expanded the overall Zelica mineralised footprint.
  • SZRC030 returned 12m @ 2.08g/t Au including 2m @ 7.58g/t Au.
  • The program delivered a 94% hit rate across 2,209m drilled.

The Pitch

  • Zelica hosts gold mineralisation across approximately 1km of drilled strike.
  • Mineralisation has been defined to approximately 115m vertical depth.
  • The system remains open along strike and at depth.
  • Gold mineralisation is hosted within an east dipping shear zone.
  • The broader project area covers an interpreted 9.5km mineralised corridor.

The Next Overs

  • High resolution magnetic surveying across the Zelica tenement package.
  • Follow up RC drilling targeting interpreted high grade plunging shoots.
  • Regional and project scale aircore drilling across priority targets.

Read full ASX Announcement here.

Middle Island Resources (ASX:MDI)

Bobija Drilling Confirms Broader Continuous Mineralised System

The Play

  • Phase 2 RC drilling extended mineralisation beyond previously defined areas.
  • Drilling intersected significant mineralisation in areas previously interpreted as barren.
  • Results supported continuity between the West and North mineralised zones.
  • Every drill hole reported to date intersected significant mineralisation.
  • Results supported a broadly continuous mineralised system across the mine area.

The Pitch

  • Bobija is a polymetallic gold silver copper lead zinc project in Serbia.
  • The project comprises six mineral licences covering 208km².
  • Mineralisation is interpreted as a broad sub horizontal layer across the mine area.
  • The Bobija mine area contains historic underground workings and drilling.
  • Gold and silver occur alongside lead zinc copper and barite mineralisation.

The Next Overs

  • Assay results remain pending from eight additional RC drill holes.
  • Additional drilling is planned to assess mineralisation extent and continuity.
  • Further soil sampling is underway in the Tisovik area.

Read full ASX Announcement here.

The Day's Play Sponsor - Topdrill

Medallion Metals (ASX:MM8)

Historical Drilling Validation Strengthens Lounge Lizard Model

The Play

  • 212 historical drill holes were validated and added to the geological database.
  • Validated drilling returned multiple high grade gold intersections beneath Lounge Lizard.
  • Updated modelling confirmed continuity across the Main, Footwall and Hanging Wall lodes.
  • Mineralisation remains open down dip and along strike.
  • Validated drilling now defines mineralisation over 1km strike and 466m depth.

The Pitch

  • Lounge Lizard forms part of the Forrestania Gold Project.
  • Gold mineralisation occurs within a shear hosted Archean gold lode system.
  • The deposit comprises Main, Footwall and Hanging Wall lodes.
  • Lounge Lizard sits on granted Mining Lease M77/545.
  • The deposit is approximately 14km from the Cosmic Boy Concentrator.

The Next Overs

  • Assays pending from completed RC drilling beneath McMahon’s.
  • Maiden Mineral Resource Estimate targeted for Q3 2026.
  • Phase 1 DD/RC drilling planned beneath Lounge Lizard.

Read full ASX Announcement here.

High Tech Metals (ASX:HTM)

Wagtail Confirmed As Free Milling Gold Deposit

The Play

  • Metallurgical testwork delivered estimated gold recoveries of up to 97.2%.
  • Testwork confirmed Wagtail hosts free milling, non refractory gold mineralisation.
  • Gold extraction remained high across grind sizes from 180µm to 75µm.
  • Rapid leach kinetics extracted essentially all cyanide recoverable gold within 8 hours.
  • Low cyanide and lime consumption supported favourable processing characteristics.

The Pitch

  • Wagtail forms part of the Mt Fisher Gold Project in Western Australia.
  • Metallurgical testing used composite samples generated from recent Wagtail drilling.
  • Gravity recoverable gold averaged approximately 45% across the test program.
  • The deposit demonstrated limited grind sensitivity across all sizes tested.
  • Wagtail mineralisation is suitable for conventional gravity and CIL/CIP processing.

The Next Overs

  • Assay results are anticipated from the current RC drilling program.
  • An updated Wagtail Mineral Resource Estimate is expected in mid June 2026.
  • Mining, toll treatment and development studies continue with SSH Mining Australia.

Read full ASX Announcement here.

Iron Bear Resources (ASX:IBR)

National Significance Application Lodged For Iron Bear Project

The Play

  • System scale tungsten anomaly defined beyond historic Garnet Mine at Iron Bear lodged an application for Project of National Significance status in Canada.
  • The application was submitted to Canada’s Major Projects Office.
  • The application was made under the Building Canada Act enacted in June 2025.
  • The framework was established to streamline approvals for major projects.
  • The Iron Bear Project is seeking recognition under the new federal framework.

The Pitch

  • Iron Bear hosts a JORC 2012 Mineral Resource of 13.6Bt @ 30% Fe.
  • The resource includes 4.5Bt @ 29.5% Fe in the Indicated category.
  • Vale has a development agreement to provide up to US$138M in funding to earn 75% of the project.
  • The project is located less than 35km from an open access railway and export port.
  • Pilot plant work produced DR grade concentrate grading 71% Fe and 1.2% SiO₂.

The Next Overs

  • No formal next steps were disclosed in the announcement.
  • No timeline for assessment of the application was provided.
  • Recognition remains subject to review under the applicable framework.

Read full ASX Announcement here.

Litchfield Minerals (ASX:LMS)

Oonagalabi Drilling Improves Geological And Targeting Models

The Play

  • Drilling confirmed broad copper zinc mineralisation across the Oonagalabi Main Zone.
  • Results improved understanding of target geometry and structural controls.
  • Multiple holes confirmed lateral and vertical continuity of mineralisation.
  • OGRC029 returned 120m at 0.35% Cu, 0.92% Zn and 4.1g/t Ag from 52m.
  • OGDD002 returned 68.26m at 0.62% Cu, 1.44% Zn and 4.3g/t Ag from 10m.

The Pitch

  • Oonagalabi is a copper zinc silver project in the Northern Territory.
  • The Main Zone contains broad stacked mineralised packages from near surface.
  • Mineralisation remains associated with multiple target areas across the project.
  • The project includes Main Zone, Bomb Diggity, VT1 and VT2 targets.
  • The campaign comprised 11 RC holes and 3 diamond holes.

The Next Overs

  • Assays remain pending from the mineralised zone in OGDD003.
  • Integration of assays, petrology and geophysics to refine targeting models.
  • Further drilling planned following interpretation of recent datasets.

Read full ASX Announcement here.

GoldArc Resources (ASX:GA8)

Eastern Sector Continuity Strengthens Mine Planning Dataset

The Play

  • Continuous ore envelope confirmed across Mt Stirling’s eastern sector.
  • Ten intercepts of 7m or greater returned grades of 1.38g/t Au or higher.
  • Grade control drilling returned 17m @ 3.48g/t Au including 5m @ 8.56g/t Au.
  • Grade control drilling returned 20m @ 1.85g/t Au including 1m @ 13.00g/t Au.
  • High grade shoots persisted within the broader envelope, including 2m @ 26.10g/t Au.

The Pitch

  • Mt Stirling hosts an Indicated Mineral Resource grading 2.1g/t Au.
  • Gold mineralisation is hosted within the Hydra Fault in altered meta basalt.
  • Gold is associated with silicified and sulphidic intervals containing elevated arsenic.
  • The 34,000m grade control program is fully funded by BML Ventures.
  • GoldArc retains 100% ownership of Mt Stirling under the profit share arrangement.

The Next Overs

  • Continue the 34,000m RC grade control program at Mt Stirling and Stirling Well.
  • Report further assay batches as processing and validation are completed.
  • Complete the remaining portion of the 34,000m drilling program.

Read full ASX Announcement here.

 

 

Continue to the full Day’s Play edition here.

 

 

Please note the following valuable information before using this website. 

Independent Research 

Market Open Australia is intended to be used only for educational and informative purposes, and any information on this website should not be taken as investment advice or guidance. It is important to conduct your own research before making any investment decisions, which should be based on your own investment needs and personal circumstances. Any investment decisions based on information contained on this website should be taken in line with independent financial advice from a qualified professional or should be independently researched and verified.