American Uranium (ASX: AUM) expands Lo Herma and sets up Q3 resource update
Bruce Lane says securing new mineral rights at Lo Herma removes tenure constraints and positions the project for a Mineral Resource update and Scoping Study in Q3 2026.
Bruce Lane says securing new mineral rights at Lo Herma removes tenure constraints and positions the project for a Mineral Resource update and Scoping Study in Q3 2026.
American Uranium has launched a $2.58M entitlement offer to fund drilling and technical studies at its Lo Herma ISR Uranium Project ahead of a planned Q3 2026 Scoping Study.
Alligator Energy has delivered early-stage ISR recovery results from its Samphire Uranium Project that align with scoping study assumptions as the field trial advances.
Bruce Lane outlines how Lo Herma’s 9.45Mlbs resource and advancing drill program are shaping the path toward ISR development.
American Uranium has delivered strong early 2026 drilling results at its Lo Herma ISR Uranium Project in Wyoming, supporting an imminent Mineral Resource Estimate update.
Alligator Energy (ASX: AGE) has completed commissioning of its Samphire field recovery trial pilot plant, clearing the final technical milestone before live uranium extraction testing begins.
American Uranium (ASX:AMU) has mobilised a drill rig to restart resource expansion drilling at its Lo Herma ISR uranium project in Wyoming, targeting growth and upgrade of the current 8.57Mlb resource ahead of planned 2026 updates.
Victor Rajasooriar, Managing Director and Chief Executive Officer of Noronex (ASX: NRX), explains why moving to 51% ownership at Etango North marks the point where technical validation gives way to controlled execution while preserving capital discipline and future optionality.
American Uranium has confirmed that hydrogeological pump testing at its Lo Herma ISR uranium project in Wyoming demonstrates aquifer performance consistent with permitted and operating ISR mines in the southern Powder River Basin, supporting planned 2026 resource and Scoping Study updates.
Alligator Energy is moving Samphire from study phase into on site operations as its pilot plant, field recovery trials and regulatory milestones line up to position the project as Australia’s next in situ uranium mine.