The Day’s Play Edition 87: Rare earth discovery, helium commercialisation and mine restart execution | LKY, BNL, VAL

THE COIN TOSS

LKY – Locksley Resources validates a 1.1km rare earth corridor with maiden drilling returning up to 6.03% TREO at El Campo.

BNL – Blue Star Helium secures its first helium offtake agreement covering all Pinon Canyon production through August 2026.

VAL – Valiant Gold moves Comet toward restart after executing a mining services agreement and commencing dewatering and rehabilitation.

BTM – Breakthrough Minerals extends copper mineralisation beyond the Barbara resource with drilling returning up to 35m at 1.34% Cu.

AVM – Advance Metals hits 33.9m at 220g/t Ag including 6.2m at 718g/t Ag, validating high grade extensions at Gavilanes.

NXM – Nexus Minerals confirms a continuous gold zone at Payns with all 30 RC holes intersecting anomalous mineralisation.

CHN – Chalice Mining upgrades Deep Blue into a drill ready copper rare earth target with rock chips returning up to 19.3% TREO.

TMX – Terrain Minerals defines a 4km by 3km gold pathfinder anomaly aligned with a concealed machine learning target.

XEN – Xenitra surpasses $1.1M in OPAL sales and expands its distribution network beyond 400 partners.

VRL – Verity Resources confirms a conventional processing pathway at Waihi after gold recoveries reached 96.99%.

LU7 – Lithium Universe launches commercialisation of its globally licensed e waste gold and copper recovery technology.

Locksley Resources (ASX:LKY)

Maiden Drilling Validates High Grade Rare Earth Corridor

THE PLAY

  • Maiden El Campo drilling returned 7.2m at 2.93% TREO including 3.75m at 4.45% TREO.

  • Peak assay returned 0.7m grading 6.03% TREO in hole ECDD0002.
  • Drilling confirmed NdPr enriched rare earth mineralisation extends below surface exposures.
  • Drilling validated a mineralised rare earth corridor extending approximately 1.1km.
  • Final DAM assays confirmed antimony mineralisation extends south and below historical workings.

THE PITCH

  • El Campo forms part of the Mojave Project in California.
  • El Campo is located approximately 5.5km southeast of the Mountain Pass Mine.
  • Nd and Pr oxides represent approximately 25% of TREO in key intercepts.
  • Rare earth mineralisation is hosted within carbonatite, syenite and shonkinite units.
  • The Mojave Project contains both rare earth and antimony prospects.

THE NEXT OVERS

  • A high resolution ground scintillometer survey is planned at El Campo.
  • Results will be incorporated into ongoing drill targeting plans.
  • Regional targeting and assessment work continues across the Mojave Project.

Read full ASX Announcement here.

—————

Blue Star Helium (ASX:BNL)

First Helium Offtake Secures Initial Production Pathway

THE PLAY

  • First formal helium offtake agreement executed covering all Pinon Canyon production output.

  • Agreement provides a fixed term through 31 August 2026.
  • Pricing is fixed for the agreement term and reflects US spot markets.
  • Offtake covers helium produced from the Galactica Project processing facility.
  • Agreement establishes a commercial sales pathway while longer term negotiations continue.

THE PITCH

  • Pinon Canyon Plant processes helium production from the Galactica Project.

  • Galactica is operated through a joint venture with Helium One.
  • Counterparty is a publicly listed US industrial gases corporation.
  • Counterparty holds an investment grade credit rating and global distribution presence.
  • Commercial discussions are underway for co produced CO2 sales.

THE NEXT OVERS

  • Longer term helium offtake negotiations continue with prospective counterparties.

  • Subsequent helium production will be delivered under the new agreement.
  • CO2 commercialisation discussions continue with multiple parties.

Read full ASX Announcement here.

—————

Valiant Gold (ASX:VAL)

Comet Mine Restart Activities Move Into Execution Phase

THE PLAY

  • Mining services agreement executed with Mako Mining for Comet restart works.

  • Dewatering and rehabilitation activities commence at Comet during June 2026.
  • Mine engineering and technical studies advance operational restart planning.
  • Key technical and operational hires strengthen mine restart execution capability.
  • Nearly 2,000m drilled at South Emu Triton with assays pending.

THE PITCH

  • Comet and Reedy gold projects are 100% owned by Valiant Gold.

  • Both projects sit within Western Australia’s Murchison gold mining region.
  • Comet contains underground mining infrastructure targeted for rehabilitation and restart.
  • Existing open pits provide storage capacity for underground water management.
  • Underground and open pit development areas span the Comet project footprint.

THE NEXT OVERS

  • Mako Mining mobilisation and portal access expected during June.

  • Underground mining contract tenders planned during June 2026.
  • First South Emu Triton assay results expected in coming weeks.

Read full ASX Announcement here.

The Day's Play Sponsor: Frontline Drilling

Breakthrough Minerals (ASX:BTM)

Barbara Drilling Confirms Resource Growth Beyond Current Model

THE PLAY

  • Maiden Barbara drilling returned 35m at 1.34% Cu from 204m.

  • High grade interval returned 18m at 2.18% Cu including 11m at 3.02% Cu.
  • Step out drilling confirmed mineralisation extends beyond the current resource boundary.
  • All 3 holes achieved geological objectives across resource and extension targets.
  • Drilling confirmed wider higher grade lodes than currently modelled in multiple areas.

THE PITCH

  • Barbara hosts a 6.5Mt Mineral Resource at 0.97% CuEq.

  • Barbara contains 63kt of contained CuEq metal within the current resource.
  • The deposit forms part of the North Queensland Copper Gold Project.
  • Barbara represents approximately one third of the project’s 200kt CuEq inventory.
  • The deposit remains open along strike and at depth.

THE NEXT OVERS

  • Remaining assay results from the current Barbara drilling program are pending.

  • Downhole EM surveys will target conductors outside the resource boundary.
  • Drilling is expected to commence at Turpentine following the Barbara program.

Read full ASX Announcement here.

—————

Advance Metals (ASX:AVM)

Maiden Drilling Validates High Grade Silver Extensions

THE PLAY

  • Maiden Gavilanes drilling returned 33.9m at 220g/t Ag from 117.6m.

  • High grade interval included 6.2m at 718g/t Ag from 133m.
  • Drilling intersected mineralisation approximately 80m down dip of historic drilling.
  • Deeper intercepts returned silver with associated gold, copper, lead and zinc.
  • Resource expansion drilling continues with assays pending from GV-26-002.

THE PITCH

  • Gavilanes hosts a Foreign Estimate of 22.4Moz AgEq at 246g/t AgEq.

  • The project is 100% owned by Advance Metals in Durango, Mexico.
  • Current drilling targets extensions to the Descubridora high grade structure.
  • The maiden drilling program is planned for up to 4,500m.
  • The broader program comprises 15 to 18 diamond drill holes.

THE NEXT OVERS

  • Receipt of assays from GV-26-002 testing the southern system extension.

  • Completion of GV-26-003 targeting further extensional mineralisation.
  • Updated geological modelling will incorporate new drilling and assay data.

Read full ASX Announcement here.

—————

Nexus Minerals (ASX:NXM)

High Grade Payns Drilling Confirms Continuous Gold Zone

THE PLAY

  • High grade Payns drilling returned up to 19.00g/t Au from RC assays.

  • All 30 reported RC holes returned anomalous gold intercepts at Payns.
  • Best result returned 5m at 8.20g/t Au including 2m at 19.00g/t Au.
  • Results define a continuous near surface mineralised zone across Payns.
  • Mineralisation remains open along strike and at depth from drilling.

THE PITCH

  • Payns forms part of the Wallbrook Gold Project in Western Australia.

  • Payns sits approximately 4km northwest of the Crusader Templar deposit.
  • The prospect covers a 900m by 750m mineralised footprint.
  • Current Wallbrook inventory comprises the 304koz Au Crusader Templar MRE.
  • The Wallbrook RC programme targets Clement, Payns, Branches and Crusader Templar.

THE NEXT OVERS

  • Additional Payns assay results expected as laboratory processing continues.

  • Drilling progresses to Branches and Crusader Templar extension targets.
  • Updated multi prospect Wallbrook Mineral Resource Estimate targeted for September quarter.

Read full ASX Announcement here.

The Day's Play Sponsor - Relait

Chalice Mining (ASX:CHN)

Deep Blue Upgraded Into Drill Ready Copper Rare Earth Target

THE PLAY

  • Deep Blue upgraded by rock chips returning up to 19.3% TREO.

  • Rock chip sampling returned high grade rare earth results within the target area.
  • Copper molybdenum silver soil anomaly extends approximately 2.5km in strike.
  • Coincident magnetic and gravity anomalies support a 2km plus hydrothermal system.
  • Land access secured for an initial 10 hole RC drilling programme.

THE PITCH

  • Deep Blue forms part of the Northam JV Project.

  • Chalice can earn up to a 70% interest in the project.
  • Target is located approximately 15km southeast of the Caravel Copper Project.
  • Peak soil sample returned 890ppm copper with silver molybdenum association.
  • The target area remains largely concealed and has no previous drilling.

THE NEXT OVERS

  • Initial 10 hole RC drilling is expected in the coming weeks.

  • Drilling remains subject to regulatory approvals.
  • Additional mineralogical characterisation work is planned as the project advances.

Read full ASX Announcement here.

—————

Terrain Minerals (ASX:TMX)

Gold Pathfinder Anomaly Aligns With Machine Learning Target

THE PLAY

  • Large 4km by 3km gold pathfinder anomaly defined from first pass soils.

  • Multi element anomaly coincides with independently interpreted concealed greenstone target.
  • 42% of anomaly samples contain two or more elevated pathfinder elements.
  • High intensity bismuth tungsten sample returned 9.91ppm Bi and 6.74ppm W.
  • Anomaly ranked within machine learning priority areas for gold and lithium.

THE PITCH

  • Carlindie is a 100% owned project in Western Australia’s East Pilbara.

  • Project sits approximately 90km southeast of Port Hedland.
  • Machine learning mapping identified priority gold and lithium target areas.
  • Anomaly footprint occurs within granted tenement E45/6524.
  • Survey targeted more than 15km of interpreted prospective geology.

THE NEXT OVERS

  • Field reconnaissance and rock chip sampling commence during July 2026.

  • UltraFine+ soil sampling program commences from August 2026.
  • UltraFine+ results expected during Q4 2026.

Read full ASX Announcement here.

—————

Xenitra (ASX:XEN)

OPAL Sales Exceed $1.1M As Distribution Network Scales

THE PLAY

  • OPAL tokenised product sales surpassed $1.1M within 7 weeks of launch.

  • Distribution network expanded to more than 400 partners across the ecosystem.
  • Sales accelerated from $500k in the first month to $1.1M.
  • Product sales and partner growth both accelerated during the quarter.
  • Biomiq Skincare was added as the second OPAL brand partner.

THE PITCH

  • OPAL is a real world asset tokenised product sales ecosystem.

  • OPAL token utility is linked directly to real product purchases.
  • The platform operates across Greater China distribution channels.
  • The ecosystem spans B2B trading, retail distribution and ecommerce channels.
  • Xenitra specialises in FMCG, nutraceutical, OTC and personal care products.

THE NEXT OVERS

  • Biomiq Skincare enters the OPAL ecosystem as the second brand partner.

  • The OPAL ecosystem now includes more than 400 distribution partners.
  • Sales activity continues through the OPAL tokenised sales ecosystem.

Read full ASX Announcement here.

The Day's Play Sponsor - MPH Lawyers

Verity Resources (ASX:VRL)

Waihi Metallurgy Confirms Conventional Processing Pathway

THE PLAY

  • Waihi metallurgical testwork delivered up to 96.99% gold recovery at 24 hours.

  • Both saprock and fresh rock composites returned recoveries approaching 97%.
  • Gravity recoveries of approximately 29% support a conventional gravity front end.
  • Low cyanide and lime consumption recorded across both metallurgical composites.
  • High recoveries were achieved across both principal Waihi geological domains.

THE PITCH

  • Waihi hosts a 17.1koz gold resource including 11.1koz Indicated.

  • Waihi forms part of the Monument Gold Project in Laverton.
  • Monument hosts a 137.7koz gold Mineral Resource across Korong and Waihi.
  • Korong and Waihi occur along approximately 20km of banded iron formation.
  • Verity owns 100% of the Monument Gold Project tenure.

THE NEXT OVERS

  • Advanced metallurgical testing including comminution studies will be undertaken.

  • More detailed mining studies are planned across the Monument Gold Project.
  • Additional metallurgical work is planned as part of those studies.

Read full ASX Announcement here.

—————

Lithium Universe (ASX:LU7)

Commercialisation Program Begins For Licensed E Waste Technology

THE PLAY

  • Lithium Universe established a commercialisation program for GCDE technology.

  • The company acquired an exclusive global GCDE licence from the University of Edinburgh.
  • A structured development program has been defined across 10 workstreams.
  • The program covers metallurgical optimisation, engineering studies and scalability assessments.
  • Pilot plant design and commercial development activities are included in the program.

THE PITCH

  • GCDE is a hydrometallurgical process designed to recover gold and copper from e waste.

  • The technology selectively recovers gold and copper using reusable organic reagents.
  • Gold recovery uses a proprietary diamide precipitation process.
  • Copper recovery uses 2,3 pyrazinedicarboxylic acid followed by copper recovery processing.
  • The technology was developed by the University of Edinburgh School of Chemistry.

THE NEXT OVERS

  • Historic research, reports and datasets will be reviewed and assessed.

  • High volume e waste feed materials will be sourced and tested.
  • Pilot plant design and commercial scalability studies will be advanced.

Read full ASX Announcement here.