The Day’s Play Edition 86: Gold resource growth, new discoveries and record drilling results | STN, DRE, 49M

THE COIN TOSS

STN – Saturn Metals added 590,000oz to Apollo Hill, lifting the gold inventory to 2.83Moz and increasing higher confidence resources to 2.19Moz.

DRE – Dreadnought Resources confirmed a new gold discovery beyond the interpreted limits of Metzke’s Find, extending mineralisation northward and at depth.

49M – 49 Metals delivered the strongest Gold Mountain intercept on record, returning 27.4m @ 8.3g/t Au including 9.1m @ 21.9g/t Au.

PHO – PhosCo uncovered a significant new phosphate discovery at DOH, defining mineralisation across a 1.3km strike and more than 600m width.

SMX – Strata Minerals expanded the Zelica gold system with a 94% drilling hit rate and mineralisation confirmed across multiple stacked lodes.

MDI – Middle Island Resources connected previously separated mineralised zones at Bobija, supporting a broader continuous mineralised system.

MM8 – Medallion Metals validated 212 historical drill holes, confirming gold continuity across more than 1km of strike and 466m of depth.

HTM – High Tech Metals confirmed Wagtail as a free milling gold deposit with recoveries of up to 97.2% from conventional processing routes.

IBR – Iron Bear Resources lodged for Project of National Significance status under Canada’s new federal approvals framework.

LMS – Litchfield Minerals strengthened the Oonagalabi copper zinc system with broad mineralised intersections and confirmed continuity across the Main Zone.

GA8 – GoldArc Resources confirmed a continuous ore envelope across Mt Stirling’s eastern sector through multiple high grade grade control results.

Saturn Metals (ASX:STN)

Apollo Hill Resource Grows 26% To 2.83Moz

The Play

  • Apollo Hill Mineral Resource increased 26% to 2.83Moz from the previous estimate.
  • The update added 590,000oz of contained gold to the resource.
  • Measured and Indicated Resources increased by 350,000oz to 2.19Moz.
  • Higher confidence Measured and Indicated categories now represent 77% of the resource.
  • The updated estimate incorporated 367 drill holes totalling 62,385m.

The Pitch

  • Apollo Hill hosts a Mineral Resource of 174Mt @ 0.51g/t Au for 2.83Moz.
  • The project is 100% owned and located near Leonora in Western Australia.
  • The resource is reported within a single open pit constraining shell.
  • Indicated Resources total 129Mt @ 0.51g/t Au for 2.10Moz.
  • Measured Resources total 4.9Mt @ 0.55g/t Au for 87,000oz.

The Next Overs

  • Apollo Hill Definitive Feasibility Study is targeted for release in late CY2026.
  • An updated Apollo Hill Ore Reserve is targeted for release in late CY2026.
  • Drilling continues to target near surface and lateral resource extensions.

Read full ASX Announcement here.

—————

Dreadnought Resources (ASX:DRE)

New Gold Discovery Extends Beyond Resource Boundary

The Play

  • New gold discovery confirmed north of Metzke’s Find across 150m strike.
  • Discovery remains open northward and at depth following initial drilling.
  • Mineralisation extends beyond a dyke previously interpreted as deposit termination.
  • Resource extension drilling returned significant gold intercepts outside the current resource.
  • Remaining 34 assays completed the 57 hole RC drilling program.

The Pitch

  • Illaara Gold Project spans approximately 800km² across a 70km greenstone belt.
  • Dreadnought holds 100% ownership of the Illaara Gold Project.
  • Metzke’s Find hosts a 14,900 oz gold resource grading 6.8 g/t.
  • Current resource contains 72% Indicated material within shallow mineralisation.
  • Gold mineralisation occurs within stacked quartz lodes hosted by mafic sequences.

The Next Overs

  • Resource update and upgrade scheduled for July 2026.
  • Updated study follows completion of the resource update.
  • RC and diamond drilling resumes at Metzke’s Find in July.

Read full ASX Announcement here.

—————

49 Metals (ASX:49M)

Highest Grade Gold Mountain Intercept Returned To Date

The Play

  • DRC#9 returned 27.4m @ 8.3g/t Au from 221.0m.
  • The 227 gram metre intercept is the highest recorded at Gold Mountain.
  • The interval included 9.1m @ 21.9g/t Au from 224.0m.
  • A second mineralised zone returned 25.9m @ 1.4g/t Au from 158.5m.
  • The high grade zone remains open at depth and in all directions.

The Pitch

  • Gold Mountain is located within the Walker Lane Trend in Nevada.
  • The project hosts a low sulphidation epithermal gold silver system.
  • DRC#9 was drilled from the same collar location as DRC#8.
  • Both holes intersected broad zones of oxide gold mineralisation.
  • The deeper high grade zone occurs at a vertical depth of 200m.

The Next Overs

  • Assays remain pending for completed holes DRC#10 to DRC#13.
  • Additional drill pads are being constructed at the Adit Zone.
  • Further drilling will test extensions to the high grade mineralisation.

Read full ASX Announcement here.

The Day's Play Sponsor - MPH Lawyers

PhosCo (ASX:PHO)

DOH Discovery Adds Significant New Phosphate Scale At Gasaat

The Play

  • Drilling confirmed DOH as a new phosphate discovery within the Gasaat Project.
  • The phosphate horizon averaged 13m thickness across the drilled area.
  • Mineralisation extends over a 1.3km strike length and more than 600m width.
  • Multiple DOH drill holes returned phosphate intercepts exceeding 10m at approximately 20% P₂O₅.
  • Results were consistent with phosphate mineralisation encountered across Gasaat.

The Pitch

  • Gasaat hosts widespread marine carbonate hosted sedimentary phosphate mineralisation.
  • DOH is a down faulted or slump block located east of GK.
  • The prospect is between 600m and 750m wide and more than 1,300m long.
  • The phosphate horizon occurs between Cretaceous marls and Eocene limestone.
  • Seven drill holes have been completed at DOH to date.

The Next Overs

  • Infill and extension drilling will be completed at DOH.
  • Further drilling will define mineralisation extent ahead of resource estimation.
  • Additional Gasaat drilling results are expected shortly.

Read full ASX Announcement here.

—————

Strata Minerals (ASX:SMX)

Phase 2 Drilling Expands Zelica Multi Lode Gold System

The Play

  • Phase 2 drilling intersected significant gold mineralisation in 16 of 17 extension holes.
  • Stacked hanging wall lodes were confirmed across multiple drill sections.
  • Additional drilling expanded the overall Zelica mineralised footprint.
  • SZRC030 returned 12m @ 2.08g/t Au including 2m @ 7.58g/t Au.
  • The program delivered a 94% hit rate across 2,209m drilled.

The Pitch

  • Zelica hosts gold mineralisation across approximately 1km of drilled strike.
  • Mineralisation has been defined to approximately 115m vertical depth.
  • The system remains open along strike and at depth.
  • Gold mineralisation is hosted within an east dipping shear zone.
  • The broader project area covers an interpreted 9.5km mineralised corridor.

The Next Overs

  • High resolution magnetic surveying across the Zelica tenement package.
  • Follow up RC drilling targeting interpreted high grade plunging shoots.
  • Regional and project scale aircore drilling across priority targets.

Read full ASX Announcement here.

—————

Middle Island Resources (ASX:MDI)

Bobija Drilling Confirms Broader Continuous Mineralised System

The Play

  • Phase 2 RC drilling extended mineralisation beyond previously defined areas.
  • Drilling intersected significant mineralisation in areas previously interpreted as barren.
  • Results supported continuity between the West and North mineralised zones.
  • Every drill hole reported to date intersected significant mineralisation.
  • Results supported a broadly continuous mineralised system across the mine area.

The Pitch

  • Bobija is a polymetallic gold silver copper lead zinc project in Serbia.
  • The project comprises six mineral licences covering 208km².
  • Mineralisation is interpreted as a broad sub horizontal layer across the mine area.
  • The Bobija mine area contains historic underground workings and drilling.
  • Gold and silver occur alongside lead zinc copper and barite mineralisation.

The Next Overs

  • Assay results remain pending from eight additional RC drill holes.
  • Additional drilling is planned to assess mineralisation extent and continuity.
  • Further soil sampling is underway in the Tisovik area.

Read full ASX Announcement here.

The Day's Play Sponsor - Topdrill

Medallion Metals (ASX:MM8)

Historical Drilling Validation Strengthens Lounge Lizard Model

The Play

  • 212 historical drill holes were validated and added to the geological database.
  • Validated drilling returned multiple high grade gold intersections beneath Lounge Lizard.
  • Updated modelling confirmed continuity across the Main, Footwall and Hanging Wall lodes.
  • Mineralisation remains open down dip and along strike.
  • Validated drilling now defines mineralisation over 1km strike and 466m depth.

The Pitch

  • Lounge Lizard forms part of the Forrestania Gold Project.
  • Gold mineralisation occurs within a shear hosted Archean gold lode system.
  • The deposit comprises Main, Footwall and Hanging Wall lodes.
  • Lounge Lizard sits on granted Mining Lease M77/545.
  • The deposit is approximately 14km from the Cosmic Boy Concentrator.

The Next Overs

  • Assays pending from completed RC drilling beneath McMahon’s.
  • Maiden Mineral Resource Estimate targeted for Q3 2026.
  • Phase 1 DD/RC drilling planned beneath Lounge Lizard.

Read full ASX Announcement here.

—————

High Tech Metals (ASX:HTM)

Wagtail Confirmed As Free Milling Gold Deposit

The Play

  • Metallurgical testwork delivered estimated gold recoveries of up to 97.2%.
  • Testwork confirmed Wagtail hosts free milling, non refractory gold mineralisation.
  • Gold extraction remained high across grind sizes from 180µm to 75µm.
  • Rapid leach kinetics extracted essentially all cyanide recoverable gold within 8 hours.
  • Low cyanide and lime consumption supported favourable processing characteristics.

The Pitch

  • Wagtail forms part of the Mt Fisher Gold Project in Western Australia.
  • Metallurgical testing used composite samples generated from recent Wagtail drilling.
  • Gravity recoverable gold averaged approximately 45% across the test program.
  • The deposit demonstrated limited grind sensitivity across all sizes tested.
  • Wagtail mineralisation is suitable for conventional gravity and CIL/CIP processing.

The Next Overs

  • Assay results are anticipated from the current RC drilling program.
  • An updated Wagtail Mineral Resource Estimate is expected in mid June 2026.
  • Mining, toll treatment and development studies continue with SSH Mining Australia.

Read full ASX Announcement here.

The Day's Play Sponsor - Lockton

Iron Bear Resources (ASX:IBR)

National Significance Application Lodged For Iron Bear Project

The Play

  • System scale tungsten anomaly defined beyond historic Garnet Mine at Iron Bear lodged an application for Project of National Significance status in Canada.
  • The application was submitted to Canada’s Major Projects Office.
  • The application was made under the Building Canada Act enacted in June 2025.
  • The framework was established to streamline approvals for major projects.
  • The Iron Bear Project is seeking recognition under the new federal framework.

The Pitch

  • Iron Bear hosts a JORC 2012 Mineral Resource of 13.6Bt @ 30% Fe.
  • The resource includes 4.5Bt @ 29.5% Fe in the Indicated category.
  • Vale has a development agreement to provide up to US$138M in funding to earn 75% of the project.
  • The project is located less than 35km from an open access railway and export port.
  • Pilot plant work produced DR grade concentrate grading 71% Fe and 1.2% SiO₂.

The Next Overs

  • No formal next steps were disclosed in the announcement.
  • No timeline for assessment of the application was provided.
  • Recognition remains subject to review under the applicable framework.

Read full ASX Announcement here.

—————

Litchfield Minerals (ASX:LMS)

Oonagalabi Drilling Improves Geological And Targeting Models

The Play

  • Drilling confirmed broad copper zinc mineralisation across the Oonagalabi Main Zone.
  • Results improved understanding of target geometry and structural controls.
  • Multiple holes confirmed lateral and vertical continuity of mineralisation.
  • OGRC029 returned 120m at 0.35% Cu, 0.92% Zn and 4.1g/t Ag from 52m.
  • OGDD002 returned 68.26m at 0.62% Cu, 1.44% Zn and 4.3g/t Ag from 10m.

The Pitch

  • Oonagalabi is a copper zinc silver project in the Northern Territory.
  • The Main Zone contains broad stacked mineralised packages from near surface.
  • Mineralisation remains associated with multiple target areas across the project.
  • The project includes Main Zone, Bomb Diggity, VT1 and VT2 targets.
  • The campaign comprised 11 RC holes and 3 diamond holes.

The Next Overs

  • Assays remain pending from the mineralised zone in OGDD003.
  • Integration of assays, petrology and geophysics to refine targeting models.
  • Further drilling planned following interpretation of recent datasets.

Read full ASX Announcement here.

—————

GoldArc Resources (ASX:GA8)

Eastern Sector Continuity Strengthens Mine Planning Dataset

The Play

  • Continuous ore envelope confirmed across Mt Stirling’s eastern sector.
  • Ten intercepts of 7m or greater returned grades of 1.38g/t Au or higher.
  • Grade control drilling returned 17m @ 3.48g/t Au including 5m @ 8.56g/t Au.
  • Grade control drilling returned 20m @ 1.85g/t Au including 1m @ 13.00g/t Au.
  • High grade shoots persisted within the broader envelope, including 2m @ 26.10g/t Au.

The Pitch

  • Mt Stirling hosts an Indicated Mineral Resource grading 2.1g/t Au.
  • Gold mineralisation is hosted within the Hydra Fault in altered meta basalt.
  • Gold is associated with silicified and sulphidic intervals containing elevated arsenic.
  • The 34,000m grade control program is fully funded by BML Ventures.
  • GoldArc retains 100% ownership of Mt Stirling under the profit share arrangement.

The Next Overs

  • Continue the 34,000m RC grade control program at Mt Stirling and Stirling Well.
  • Report further assay batches as processing and validation are completed.
  • Complete the remaining portion of the 34,000m drilling program.

Read full ASX Announcement here.