The Day’s Play Edition 86: Gold resource growth, new discoveries and record drilling results | STN, DRE, 49M
THE COIN TOSS
STN – Saturn Metals added 590,000oz to Apollo Hill, lifting the gold inventory to 2.83Moz and increasing higher confidence resources to 2.19Moz.
DRE – Dreadnought Resources confirmed a new gold discovery beyond the interpreted limits of Metzke’s Find, extending mineralisation northward and at depth.
49M – 49 Metals delivered the strongest Gold Mountain intercept on record, returning 27.4m @ 8.3g/t Au including 9.1m @ 21.9g/t Au.
PHO – PhosCo uncovered a significant new phosphate discovery at DOH, defining mineralisation across a 1.3km strike and more than 600m width.
SMX – Strata Minerals expanded the Zelica gold system with a 94% drilling hit rate and mineralisation confirmed across multiple stacked lodes.
MDI – Middle Island Resources connected previously separated mineralised zones at Bobija, supporting a broader continuous mineralised system.
MM8 – Medallion Metals validated 212 historical drill holes, confirming gold continuity across more than 1km of strike and 466m of depth.
HTM – High Tech Metals confirmed Wagtail as a free milling gold deposit with recoveries of up to 97.2% from conventional processing routes.
IBR – Iron Bear Resources lodged for Project of National Significance status under Canada’s new federal approvals framework.
LMS – Litchfield Minerals strengthened the Oonagalabi copper zinc system with broad mineralised intersections and confirmed continuity across the Main Zone.
GA8 – GoldArc Resources confirmed a continuous ore envelope across Mt Stirling’s eastern sector through multiple high grade grade control results.
Saturn Metals (ASX:STN)
Apollo Hill Resource Grows 26% To 2.83Moz
|
|
The Play
- Apollo Hill Mineral Resource increased 26% to 2.83Moz from the previous estimate.
- The update added 590,000oz of contained gold to the resource.
- Measured and Indicated Resources increased by 350,000oz to 2.19Moz.
- Higher confidence Measured and Indicated categories now represent 77% of the resource.
- The updated estimate incorporated 367 drill holes totalling 62,385m.
The Pitch
- Apollo Hill hosts a Mineral Resource of 174Mt @ 0.51g/t Au for 2.83Moz.
- The project is 100% owned and located near Leonora in Western Australia.
- The resource is reported within a single open pit constraining shell.
- Indicated Resources total 129Mt @ 0.51g/t Au for 2.10Moz.
- Measured Resources total 4.9Mt @ 0.55g/t Au for 87,000oz.
The Next Overs
- Apollo Hill Definitive Feasibility Study is targeted for release in late CY2026.
- An updated Apollo Hill Ore Reserve is targeted for release in late CY2026.
- Drilling continues to target near surface and lateral resource extensions.
Read full ASX Announcement here.
|
|
|
|
Dreadnought Resources (ASX:DRE)
New Gold Discovery Extends Beyond Resource Boundary
|
|
The Play
- New gold discovery confirmed north of Metzke’s Find across 150m strike.
- Discovery remains open northward and at depth following initial drilling.
- Mineralisation extends beyond a dyke previously interpreted as deposit termination.
- Resource extension drilling returned significant gold intercepts outside the current resource.
- Remaining 34 assays completed the 57 hole RC drilling program.
The Pitch
- Illaara Gold Project spans approximately 800km² across a 70km greenstone belt.
- Dreadnought holds 100% ownership of the Illaara Gold Project.
- Metzke’s Find hosts a 14,900 oz gold resource grading 6.8 g/t.
- Current resource contains 72% Indicated material within shallow mineralisation.
- Gold mineralisation occurs within stacked quartz lodes hosted by mafic sequences.
The Next Overs
- Resource update and upgrade scheduled for July 2026.
- Updated study follows completion of the resource update.
- RC and diamond drilling resumes at Metzke’s Find in July.
Read full ASX Announcement here.
|
|
|
|
49 Metals (ASX:49M)
Highest Grade Gold Mountain Intercept Returned To Date
|
|
The Play
- DRC#9 returned 27.4m @ 8.3g/t Au from 221.0m.
- The 227 gram metre intercept is the highest recorded at Gold Mountain.
- The interval included 9.1m @ 21.9g/t Au from 224.0m.
- A second mineralised zone returned 25.9m @ 1.4g/t Au from 158.5m.
- The high grade zone remains open at depth and in all directions.
The Pitch
- Gold Mountain is located within the Walker Lane Trend in Nevada.
- The project hosts a low sulphidation epithermal gold silver system.
- DRC#9 was drilled from the same collar location as DRC#8.
- Both holes intersected broad zones of oxide gold mineralisation.
- The deeper high grade zone occurs at a vertical depth of 200m.
The Next Overs
- Assays remain pending for completed holes DRC#10 to DRC#13.
- Additional drill pads are being constructed at the Adit Zone.
- Further drilling will test extensions to the high grade mineralisation.
Read full ASX Announcement here.
|
|

PhosCo (ASX:PHO)
DOH Discovery Adds Significant New Phosphate Scale At Gasaat
|
|
The Play
- Drilling confirmed DOH as a new phosphate discovery within the Gasaat Project.
- The phosphate horizon averaged 13m thickness across the drilled area.
- Mineralisation extends over a 1.3km strike length and more than 600m width.
- Multiple DOH drill holes returned phosphate intercepts exceeding 10m at approximately 20% P₂O₅.
- Results were consistent with phosphate mineralisation encountered across Gasaat.
The Pitch
- Gasaat hosts widespread marine carbonate hosted sedimentary phosphate mineralisation.
- DOH is a down faulted or slump block located east of GK.
- The prospect is between 600m and 750m wide and more than 1,300m long.
- The phosphate horizon occurs between Cretaceous marls and Eocene limestone.
- Seven drill holes have been completed at DOH to date.
The Next Overs
- Infill and extension drilling will be completed at DOH.
- Further drilling will define mineralisation extent ahead of resource estimation.
- Additional Gasaat drilling results are expected shortly.
Read full ASX Announcement here.
|
|
|
|
Strata Minerals (ASX:SMX)
Phase 2 Drilling Expands Zelica Multi Lode Gold System
|
|
The Play
- Phase 2 drilling intersected significant gold mineralisation in 16 of 17 extension holes.
- Stacked hanging wall lodes were confirmed across multiple drill sections.
- Additional drilling expanded the overall Zelica mineralised footprint.
- SZRC030 returned 12m @ 2.08g/t Au including 2m @ 7.58g/t Au.
- The program delivered a 94% hit rate across 2,209m drilled.
The Pitch
- Zelica hosts gold mineralisation across approximately 1km of drilled strike.
- Mineralisation has been defined to approximately 115m vertical depth.
- The system remains open along strike and at depth.
- Gold mineralisation is hosted within an east dipping shear zone.
- The broader project area covers an interpreted 9.5km mineralised corridor.
The Next Overs
- High resolution magnetic surveying across the Zelica tenement package.
- Follow up RC drilling targeting interpreted high grade plunging shoots.
- Regional and project scale aircore drilling across priority targets.
Read full ASX Announcement here.
|
|
|
|
Middle Island Resources (ASX:MDI)
Bobija Drilling Confirms Broader Continuous Mineralised System
|
|
The Play
- Phase 2 RC drilling extended mineralisation beyond previously defined areas.
- Drilling intersected significant mineralisation in areas previously interpreted as barren.
- Results supported continuity between the West and North mineralised zones.
- Every drill hole reported to date intersected significant mineralisation.
- Results supported a broadly continuous mineralised system across the mine area.
The Pitch
- Bobija is a polymetallic gold silver copper lead zinc project in Serbia.
- The project comprises six mineral licences covering 208km².
- Mineralisation is interpreted as a broad sub horizontal layer across the mine area.
- The Bobija mine area contains historic underground workings and drilling.
- Gold and silver occur alongside lead zinc copper and barite mineralisation.
The Next Overs
- Assay results remain pending from eight additional RC drill holes.
- Additional drilling is planned to assess mineralisation extent and continuity.
- Further soil sampling is underway in the Tisovik area.
Read full ASX Announcement here.
|
|

Medallion Metals (ASX:MM8)
Historical Drilling Validation Strengthens Lounge Lizard Model
|
|
The Play
- 212 historical drill holes were validated and added to the geological database.
- Validated drilling returned multiple high grade gold intersections beneath Lounge Lizard.
- Updated modelling confirmed continuity across the Main, Footwall and Hanging Wall lodes.
- Mineralisation remains open down dip and along strike.
- Validated drilling now defines mineralisation over 1km strike and 466m depth.
The Pitch
- Lounge Lizard forms part of the Forrestania Gold Project.
- Gold mineralisation occurs within a shear hosted Archean gold lode system.
- The deposit comprises Main, Footwall and Hanging Wall lodes.
- Lounge Lizard sits on granted Mining Lease M77/545.
- The deposit is approximately 14km from the Cosmic Boy Concentrator.
The Next Overs
- Assays pending from completed RC drilling beneath McMahon’s.
- Maiden Mineral Resource Estimate targeted for Q3 2026.
- Phase 1 DD/RC drilling planned beneath Lounge Lizard.
Read full ASX Announcement here.
|
|
|
|
High Tech Metals (ASX:HTM)
Wagtail Confirmed As Free Milling Gold Deposit
|
|
The Play
- Metallurgical testwork delivered estimated gold recoveries of up to 97.2%.
- Testwork confirmed Wagtail hosts free milling, non refractory gold mineralisation.
- Gold extraction remained high across grind sizes from 180µm to 75µm.
- Rapid leach kinetics extracted essentially all cyanide recoverable gold within 8 hours.
- Low cyanide and lime consumption supported favourable processing characteristics.
The Pitch
- Wagtail forms part of the Mt Fisher Gold Project in Western Australia.
- Metallurgical testing used composite samples generated from recent Wagtail drilling.
- Gravity recoverable gold averaged approximately 45% across the test program.
- The deposit demonstrated limited grind sensitivity across all sizes tested.
- Wagtail mineralisation is suitable for conventional gravity and CIL/CIP processing.
The Next Overs
- Assay results are anticipated from the current RC drilling program.
- An updated Wagtail Mineral Resource Estimate is expected in mid June 2026.
- Mining, toll treatment and development studies continue with SSH Mining Australia.
Read full ASX Announcement here.
|
|
|
|
Iron Bear Resources (ASX:IBR)
National Significance Application Lodged For Iron Bear Project
|
|
The Play
- System scale tungsten anomaly defined beyond historic Garnet Mine at Iron Bear lodged an application for Project of National Significance status in Canada.
- The application was submitted to Canada’s Major Projects Office.
- The application was made under the Building Canada Act enacted in June 2025.
- The framework was established to streamline approvals for major projects.
- The Iron Bear Project is seeking recognition under the new federal framework.
The Pitch
- Iron Bear hosts a JORC 2012 Mineral Resource of 13.6Bt @ 30% Fe.
- The resource includes 4.5Bt @ 29.5% Fe in the Indicated category.
- Vale has a development agreement to provide up to US$138M in funding to earn 75% of the project.
- The project is located less than 35km from an open access railway and export port.
- Pilot plant work produced DR grade concentrate grading 71% Fe and 1.2% SiO₂.
The Next Overs
- No formal next steps were disclosed in the announcement.
- No timeline for assessment of the application was provided.
- Recognition remains subject to review under the applicable framework.
Read full ASX Announcement here.
|
|
|
|
Litchfield Minerals (ASX:LMS)
Oonagalabi Drilling Improves Geological And Targeting Models
|
|
The Play
- Drilling confirmed broad copper zinc mineralisation across the Oonagalabi Main Zone.
- Results improved understanding of target geometry and structural controls.
- Multiple holes confirmed lateral and vertical continuity of mineralisation.
- OGRC029 returned 120m at 0.35% Cu, 0.92% Zn and 4.1g/t Ag from 52m.
- OGDD002 returned 68.26m at 0.62% Cu, 1.44% Zn and 4.3g/t Ag from 10m.
The Pitch
- Oonagalabi is a copper zinc silver project in the Northern Territory.
- The Main Zone contains broad stacked mineralised packages from near surface.
- Mineralisation remains associated with multiple target areas across the project.
- The project includes Main Zone, Bomb Diggity, VT1 and VT2 targets.
- The campaign comprised 11 RC holes and 3 diamond holes.
The Next Overs
- Assays remain pending from the mineralised zone in OGDD003.
- Integration of assays, petrology and geophysics to refine targeting models.
- Further drilling planned following interpretation of recent datasets.
Read full ASX Announcement here.
|
|
|
|
GoldArc Resources (ASX:GA8)
Eastern Sector Continuity Strengthens Mine Planning Dataset
|
|
The Play
- Continuous ore envelope confirmed across Mt Stirling’s eastern sector.
- Ten intercepts of 7m or greater returned grades of 1.38g/t Au or higher.
- Grade control drilling returned 17m @ 3.48g/t Au including 5m @ 8.56g/t Au.
- Grade control drilling returned 20m @ 1.85g/t Au including 1m @ 13.00g/t Au.
- High grade shoots persisted within the broader envelope, including 2m @ 26.10g/t Au.
The Pitch
- Mt Stirling hosts an Indicated Mineral Resource grading 2.1g/t Au.
- Gold mineralisation is hosted within the Hydra Fault in altered meta basalt.
- Gold is associated with silicified and sulphidic intervals containing elevated arsenic.
- The 34,000m grade control program is fully funded by BML Ventures.
- GoldArc retains 100% ownership of Mt Stirling under the profit share arrangement.
The Next Overs
- Continue the 34,000m RC grade control program at Mt Stirling and Stirling Well.
- Report further assay batches as processing and validation are completed.
- Complete the remaining portion of the 34,000m drilling program.
Read full ASX Announcement here.
|
|