The Day’s Play Edition 82: Lithium commissioning, tungsten recovery gains and shallow REE intercepts | GLN, VKA, BSN

THE COIN TOSS

GLN – Galan Lithium completed HMW wet plant commissioning and produced first processed lithium chloride ahead of planned H2 2026 concentrate sales.

VKA – Viking Mines lifted Linka tungsten recovery to 59.8% while producing 62.5% WO3 premium concentrate from combined gravity and flotation testwork.

BSN – Basin Energy intersected 18m @ 401 ppm NdPr oxide from surface at Newmans, confirming shallow high-grade rare earth continuity across weathered granites.

XPD – Xpedra Resources intersected 52m @ 1.35g/t Au from 20m at Springfield, confirming broad shallow gold continuity with multiple higher-grade intervals.

BTR – Brightstar Resources intersected multiple visible gold zones across deep Two Mile Hill drilling targeting higher-confidence underground resource classification ahead of PFS studies.

RMX – Red Mountain Mining secured 100% ownership of the Pioneer Tungsten Project alongside historical skarn-hosted tungsten drilling and near-term drilling approvals in Montana.

CCM – Cadoux secured European EV battery qualification for premiumHPA®, validating technical and commercial acceptance across multiple battery architectures and manufacturing conditions.

TG6 – TG Metals secured drilling approvals to test laterite gold extensions outside the existing Van Uden Mineral Resource supporting heap leach development studies.

MHC – Manhattan received final drilling approvals and a CA$250,000 grant supporting maiden 4,000m RC drilling at the Hook Lake project in Nunavut.

GA8 – GoldArc Resources intersected 1m @ 106g/t Au during fourth-round grade control drilling confirming high-grade shoot continuity across the Mt Stirling deposit.

IMU – Imugene dosed the first patient in its BTKi combination cohort expanding the azer-cel Phase 1b blood cancer study across multiple B-cell malignancies.

Galan Lithium (ASX:GLN)

Galan Produces First Processed Lithium Chloride At HMW

The Play

  • First processed lithium chloride produced at Hombre Muerto West final evaporation ponds

  • Wet plant commissioning completed with optimisation phase now underway at HMW
  • Nanofiltration plant achieved impurity rejection consistent with design specifications during commissioning
  • Circa 10,000t LCE brine inventory supports sustained production ramp up activities
  • Phase 1 expansion from 4ktpa to 5.2ktpa LCE remains on track

The Pitch

  • HMW is a 100% owned lithium brine project located in Catamarca Argentina

  • Processed lithium chloride discharged into final evaporation ponds for further concentration
  • Galan holds construction permits for Phase 2 expansion targeting 21ktpa LCE capacity
  • HMW forms part of Galan’s broader staged production pathway toward 60ktpa LCE
  • Galan’s total resource inventory currently stands at 9.5Mt LCE across Argentine projects

The Next Overs

  • Optimisation work continues before stabilised production rates are achieved at HMW

  • First lithium chloride concentrate sales targeted during H2 2026
  • Pond construction for 5.2ktpa Phase 1 expansion commencing shortly

Read full ASX Announcement here.

—————

Viking Mines (ASX:VKA)

Linka Metallurgy Lifts Tungsten Recovery To 59.8%

The Play

  • Combined gravity and flotation testwork produced 62.5% WO3 concentrate at 59.8% recovery

  • Metallurgical recovery improved from previously reported 46.0% recovery at 56.4% WO3
  • Gravity circuit alone delivered 66.6% WO3 concentrate at 42.7% recovery
  • Validation testwork completed on larger 10kg sample supporting gravity circuit scale up
  • Flotation optimisation work underway targeting recovery above 70% at over 50% WO3

The Pitch

  • Linka Tungsten Project located in Nevada within the United States tungsten supply chain

  • Metallurgical programme targets low CAPEX gravity led tungsten processing flowsheet development
  • Combined circuit processed feed grading 1.2% WO3 during current metallurgical testwork
  • Mineral Technologies advancing conceptual processing study and plant design optimisation
  • Viking can acquire 100% project interest through staged US$2.88M acquisition payments

The Next Overs

  • Variability testing planned across remaining bulk samples from Linka project area

  • Ore sorting and comminution testing programmes remain underway
  • Maiden drilling programme remains targeted for June 2026 quarter

Read full ASX Announcement here.

—————

Basin Energy Limited (ASX:BSN)

Basin Energy intersects 18m @ 401 ppm NdPr oxide from surface at Newmans, confirming shallow high-grade REE

The Play

  • SBRC26003 intersects 18m @ 401 ppm NdPr oxide and 49 ppm DyTb oxide from surface.

  • Subintervals include 6m @ 552 ppm NdPr oxide and 48 ppm DyTb oxide from 3m.
  • 3m @ 603 ppm NdPr oxide and 109 ppm DyTb oxide from 12m within 3,613 ppm TREO.
  • Mineralisation occurs within strongly weathered granite profile from surface.
  • SBRC26006 intersected strongest preserved weathering profile, validating Basin’s geological model.

The Pitch

  • Newmans Prospect sits within Sybella Batholith, 20 km south of Red Metal’s Sybella REE discovery.

  • Program tested 8 vertical holes over 627m across a 9 km north-south transect.
  • Targets focus on preserved weathering zones above fertile rare earth-bearing granites.
  • 2023 NeoDys auger identified NdPr-dominant REE anomalism in weathered granites.
  • Follow-up work fully funded by recent A$1.1M strategic placement.

The Next Overs

  • Complete assays for remaining five drillholes by mid-June 2026.

  • Integrate results with geological logging, chip tray observations, satellite imagery, and mapping.
  • Refine preserved weathering model and assess potential preliminary mineralogical and metallurgical programs.

Read full ASX Announcement here.

The Day's Play Sponsor - OffshoreX

Xpedra Resources Limited (ASX:XPD)

Xpedra intersects 52m @ 1.35g/t Au at Springfield, confirming broad, shallow high-grade gold continuity

The Play

  • Three RC holes intersect wide, shallow gold including 52m @ 1.35g/t Au from 20m.

  • SFRC004 contains higher-grade intervals of 11m @ 3.03g/t Au and 4m @ 5.69g/t Au.
  • SFRC003 and SFRC005 confirm broad, shallow mineralisation across multiple sections.
  • Mineralisation occurs within quartz veins, highlighting targets for extensions and drilling optimisation.
  • Assays for 22 additional holes remain pending, supporting evaluation of system continuity.

The Pitch

  • Springfield Deposit spans 1,700m-long mineralised intrusion within the Lachlan Fold Belt, NSW.

  • Xpedra acquired 100% interest in November 2025; historical drilling defined mineralised zones.
  • Previous shallow drilling intersected thick, high-grade mineralisation including 27m @ 3.65g/t Au from surface.
  • Targets include structurally controlled quartz vein zones, open at depth and along strike.
  • Maiden RC drilling program designed to test continuity, scale and extensions of the deposit.

The Next Overs

  • Complete assays for remaining 22 holes in the maiden RC program.

  • Commence June RC drilling to expand and refine mineralised footprint.
  • Analyse results to guide future drill targeting and evaluate broader system continuity.

Read full ASX Announcement here.

—————

Brightstar Resources (ASX:BTR)

Visible Gold Expands Across Deep Two Mile Hill Drilling

The Play

  • Multiple visible gold zones intersected across deep Two Mile Hill diamond drillholes

  • Visible gold extended through Tonalite intrusions and neighbouring mafic host rocks
  • Drilling targeted resource zones extending more than 550m below surface
  • Ongoing 9,100m program targets higher confidence resource classification for PFS inclusion
  • Quartz vein hosted visible gold identified across multiple completed drill intervals

The Pitch

  • Sandstone Gold Project hosts 2.4Moz Mineral Resource grading 1.5g/t Au

  • Two Mile Hill and Shillington contain 753koz grading 1.5g/t Au combined
  • Tonalite hosted mineralisation contains 664koz grading 1.6g/t Au within current estimate
  • Gold mineralisation occurs across Tonalite, basalt and BIF host rocks
  • Current drilling combines RC pre collars and diamond tails across 20 drillholes

The Next Overs

  • Assays from current drilling expected during coming weeks

  • Drilling continues targeting deeper Two Mile Hill resource zones
  • Sandstone pre feasibility study targeted during 2H CY26

Read full ASX Announcement here.

—————

Red Mountain Mining (ASX:RMX)

Red Mountain secures 100% ownership of Pioneer Tungsten Project with high-quality skarn targets in Montana

The Play

  • Red Mountain completes due diligence and acquires full ownership of Pioneer Tungsten Project.

  • Historical Greenstone drilling includes 10.7m @ 0.48% WO3 and 5.8m @ 0.43% WO3.
  • Massive garnet skarns up to 25m thick contain scheelite assaying over 0.5% WO3.
  • Work underway to secure approvals for drilling at Greenstone to test downdip extensions.
  • Project strategically located adjacent to Almonty’s Gentung deposit and historic Ivanhoe and Lost Creek mines.

The Pitch

  • Pioneer Tungsten Project covers 209 hectares along eastern margin of Mount Torrey Batholith.

  • Three key prospects: Greenstone, Mammoth, and Lost Creek, hosting skarn-style tungsten mineralisation.
  • Historical exploration included mapping, channel sampling, wagon drilling, and adit production in 1950s.
  • Tungsten occurs in scheelite-bearing garnet skarns within contact metamorphic aureoles.
  • Project secured under US BLM-managed land with full legal tenure and 100% ownership by RMX.

The Next Overs

  • Launch initial sampling program at Pioneer Tungsten Project in early June 2026.

  • Commence drilling program at Greenstone once approvals are secured.
  • Analyse drill results to define high-quality shallow targets and downdip extensions within skarn systems.

Read full ASX Announcement here.

 

The Day's Play Sponsor - Relait

Cadoux Ltd (ASX:CCM)

Cadoux premiumHPA® cleared for EU EV battery applications, confirming technical and commercial acceptance

The Play

  • SAFELOOP qualifies premiumHPA® after 24 months of multi-stage trials.

  • PremiumHPA® validated across multiple battery architectures, confirming performance and safety under extremes.
  • Ultra-high purity HPA improves separator heat resistance, reducing shrinkage and thermal runaway risk.
  • Qualification confirms reliability and compatibility across multiple cell chemistries and manufacturing conditions.
  • Validation establishes technical and commercial acceptance for EV battery applications.

The Pitch

  • PremiumHPA® is ultra-high purity alumina for advanced battery applications.

  • SAFELOOP is a European consortium developing Gen3 Li-Ion EV batteries with EU backing.
  • HPA is a critical material for separators in heavy duty automotive Li-Ion batteries.
  • Qualification involved a seven-step assessment including pilot scale, reliability, abuse and commercial testing.
  • Cadoux is positioned as an emerging HPA developer with a pathway to commercial supply.

The Next Overs

  • Explore potential binding offtake agreements following premiumHPA® qualification with SAFELOOP.

  • Develop strategic partnerships within Western critical minerals supply chains for HPA commercialisation.
  • Progress downstream supply discussions using technical validation and commercial credibility from EU trials.

Read full ASX Announcement here.

—————

TG Metals (ASX:TG6)

Laterite Gold Expansion Drilling Begins At Van Uden

The Play

  • Drilling approvals granted for laterite gold targets outside existing Van Uden Mineral Resource
  • Auger drilling to test surface laterite extensions surrounding current gold resource areas
  • Planned drilling targets shallow mineralisation with holes expected up to 5m deep
  • Drilling will assess laterite and pisolite content alongside gold analytical testing
  • Preparations underway with drilling rig expected onsite during mid next week

The Pitch

  • Van Uden Gold Deposit hosts 7.94Mt grading 1.06g/t Au for 270,800oz

  • Laterite Mineral Resource totals 1.05Mt grading 0.52g/t Au for 17,700oz
  • Surface laterite mineralisation remains current focus for heap leach development studies
  • Heap leach consultants engaged refining leach pad, plant and infrastructure preliminary designs
  • Van Uden Gold Resource contains 56% Indicated material supporting mining and processing studies

The Next Overs

  • Additional laterite target drilling scheduled to commence next week

  • Column leach testwork continues with gold recoveries still progressing
  • Site infrastructure planning and heap leach equipment sourcing remain underway

Read full ASX Announcement here.

—————

Manhattan Gold Corporation Ltd (ASX:MHC)

Manhattan approved for 4,000m RC drilling at Hook Lake with CA$250,000 grant in Nunavut

The Play

  • Manhattan secures approvals from Kivalliq Inuit Association for RC drilling at Hook Lake.

  • Federal Minister accepts NIRB positive screening, enabling a seven-year exploration period.
  • Camp mobilisation underway; RC drilling starts immediately after setup.
  • CA$250,000 grant awarded under DIG Program for maiden 4,000m RC drilling program.
  • Funding underscores Nunavut as a favourable jurisdiction for early-stage exploration.

The Pitch

  • Hook Lake Project spans 665km² within Rankin-Ennadai Greenstone Belt, Nunavut.

  • Manhattan Gold is an early-stage gold and polymetallic explorer in tier 1 jurisdictions.
  • Permits issued to 6106 Resources Limited for seven-year exploration window.
  • NIRB approval allows compliant exploration for the seven-year period.
  • Manhattan engages responsibly with Inuit and First Nations communities.

The Next Overs

  • Start 4,000m RC drilling immediately after camp mobilisation.

  • Deploy CA$250,000 grant directly to Hook Lake drilling activities.
  • Conduct exploration under formal approvals, fully adhering to Nunavut permitting requirements.

Read full ASX Announcement here.

The Day's Play Sponsor -Pareto Capital

GoldArc Resources (ASX:GA8)

Mt Stirling intercepts 1m at 106g/t Au, confirming high-grade shoot continuity

The Play

  • 1m @ 106g/t Au intercepted in fourth round RC grade control program.

  • High-grade hits include 1m @ 14g/t and 1m @ 13.7g/t Au from shallow depths.
  • Broader intercepts include 13m @ 2.33g/t and 18m @ 1.42g/t Au with internal highs.
  • Program covers 141 holes for 4,021m across eastern sector infill targets.
  • Grade control now past 50% of 34,000m total, confirming deposit shoot continuity.

The Pitch

  • Mt Stirling deposit spans 69 leases covering 17,876 hectares.

  • Mineralisation controlled by Hydra Fault within greenschist-altered meta-basalt.
  • Gold occurs in silicified, sulphidic intervals with elevated arsenic content.
  • Program fully funded by BML Ventures under 50/50 net profit share.
  • GoldArc retains 100% ownership of Mt Stirling (M37/1306).

The Next Overs

  • Continue 34,000m RC grade control program across Mt Stirling and Stirling Well.

  • Additional assay batches released progressively after QAQC validation and geological review.
  • Grade control data feeds directly into mine planning under BML Ventures share.

Read full ASX Announcement here.

—————

Imugene (ASX:IMU)

Imugene Expands Azer-cel Study Into BTKi Combination Cohort

The Play

  • First patient dosed in BTKi combination cohort within ongoing azer-cel Phase 1b study

  • Combination cohort targets patients previously failing BTKi therapy across multiple B-cell malignancies
  • Azer-cel combined with BTKi treatment to evaluate safety and preliminary efficacy
  • Enrolment continues across 10 US sites and 5 Australian clinical trial locations
  • Mantle Cell Lymphoma patient enrolled within expanded BTKi combination treatment cohort

The Pitch

  • Azer-cel is an allogeneic off the shelf CAR T cell therapy candidate

  • Phase 1b study spans multiple advanced blood cancers with unmet treatment needs
  • Trial includes follicular lymphoma, CLL, SLL, MZL, WM and mantle cell lymphoma
  • Global BTKi market reached approximately US$12.0B during 2025
  • Azer-cel Phase 1b study operates across multi centre US and Australian trial sites

The Next Overs

  • Further patient enrolment continues across BTKi combination cohort study sites

  • Safety and preliminary efficacy data expected as patients become evaluable
  • Additional trial updates planned as clinical data matures

Read full ASX Announcement here.