The Day’s Play Edition 81: ASX licensing deals, graphite processing JVs and reserve growth updates | Recce secures MENA pathway, IG6 signs European processing JV, Ariana lifts Dokwe reserves 42%

THE COIN TOSS

RCE – Recce Pharmaceuticals secured a 10 year exclusive MENA licensing pathway for R327G with potential milestone payments up to USD$3.5M.

IG6 – International Graphite signed a binding JV establishing a European graphite processing platform targeting 10,000t/y initial capacity.

AA2 – Ariana Resources lifted Dokwe Ore Reserves 42% to 1.13Moz as revised PFS increased pre tax NPV10 to US$1,056M.

LU7 – Lithium Universe secured exclusive global rights to commercialise e waste technology recovering gold and copper.

MRR – Minrex Resources fully funded ~7,000m drilling targeting Barje resource conversion and advancing Tlamino toward development studies.

BGD – Barton Gold extended higher grade Area 51 mineralisation beyond pit limits as Tunkillia drilling expanded resource growth potential.

CRS – Caprice Resources expanded the Island gold system with new high grade intercepts beyond the Vadrians trend.

SVY – Stavely Minerals advanced Thursday’s Gossan development pathway after optimisation work captured most of the 60Mt resource.

WC1 – West Cobar Metals achieved up to 81% scandium recovery supporting lower cost processing pathways.

YUG – Yugo Metals confirmed a new Erak gold system after every maiden drillhole intersected mineralised alteration.

AM5 – Antares Metals confirmed district scale high grade gold at Quinns and advanced 3 targets toward maiden drilling.

Recce Pharmaceuticals (ASX:RCE)

Exclusive MENA Licensing Term Sheet Advances Commercial Pathway

THE PLAY

  • Recce signed 10 year exclusive MENA licensing term sheet for R327G

  • Proposed agreement includes upfront fees and up to USD$3.5M milestones
  • Commercial terms allocate 30% net selling price plus 6% royalty thresholds
  • Regulatory submission plans rely on current Phase 3 DFI trial data
  • Term sheet covers commercial sales and distribution across MENA markets

THE PITCH

  • R327G targets Diabetic Foot Infections across high burden diabetes regions
  • Proposed licensing territory spans Saudi Arabia, GCC countries and North Africa
  • Recce retains responsibility for manufacturing and supplying R327G treatments
  • Registrational Phase 3 DFI trial continues enrolling patients in Indonesia
  • Licensee operates across more than 30 international pharmaceutical markets

THE NEXT OVERS

  • Parties aim to finalise definitive licensing agreement next quarter
  • Ongoing negotiations and due diligence precede final agreement execution
  • Ongoing Phase 3 trial data intended for KSA regulatory submission

Read full ASX Announcement here.

—————

International Graphite (ASX:IG6)

Binding JV Establishes European Graphite Processing Platform

THE PLAY

  • IG6 signed binding JV with Alkeemia for Italian graphite processing hub

  • JV targets 10,000t/y capacity, expanding to 15,000t/y within three years
  • Ownership set at Alkeemia 51% and IG6 49% with equal profit share
  • Construction targeted Q3 2026 with first production planned H2 2027
  • Binding agreement formalises graphite processing development at Porto Marghera

THE PITCH

  • JV located at Alkeemia’s Porto Marghera chemical facility in Italy

  • Existing infrastructure includes permitting, laboratories, logistics and workforce
  • IG6 funds initial capacity while Alkeemia contributes industrial infrastructure
  • Equal board representation governs JV operations and approvals
  • Existing site includes port, rail and waste management infrastructure

THE NEXT OVERS

  • Technical studies continue supporting financial guidance and FID

  • Engineering and cost estimates advance toward investment decisions
  • Funding initiatives progress while expansion targets JV operational funding

Read full ASX Announcement here.

—————

Ariana Resources (ASX:AA2)

Dokwe PFS Lifts Reserves And Project Economics

THE PLAY

  • Ore Reserves rose 42% to 1.13Moz under revised Dokwe PFS

  • Pre tax NPV10 reached US$1,056M with 92% IRR assumptions
  • Mineral Resource Estimate expanded 13% to 1.6Moz across Dokwe deposits
  • Pre production capital requirement totalled US$163.9M with 1 year payback
  • Production schedule outlines 1.06Moz gold across 20 year project life

THE PITCH

  • Dokwe Project contains Dokwe North and Dokwe Central gold deposits

  • Granted mining claims in Zimbabwe remain wholly owned by subsidiaries
  • Revised PFS uses planned processing capacity of 2.5Mtpa
  • High grade ore above 1.0g/t Au receives priority processing
  • Company reported A$53M pro forma cash and investments with no debt

THE NEXT OVERS

  • Definitive Feasibility Study targeted for delivery in Q1 CY27

  • Geotechnical and metallurgical drilling programmes continue supporting DFS studies
  • Additional data collection continues for Dokwe Central Reserve conversion

Read full ASX Announcement here.

The Day's Play Sponsor: Frontline Drilling

Lithium Universe (ASX:LU7)

Global Licence Secured For E Waste Metal Recovery

THE PLAY

  • Lithium Universe secured exclusive global rights to GCDE technology.

  • Licence grants commercialisation and sublicensing rights worldwide.
  • GCDE selectively recovers gold and copper from electronic waste.
  • Technology avoids high temperature smelting and pyrolysis methods.
  • Agreement expands existing recycling strategy into gold and copper recovery.

THE PITCH

  • GCDE extracts gold first, followed by staged copper recovery.

  • Process uses reusable organic compounds under low temperature conditions.
  • Licence term spans 20 years or remaining patent life.
  • University receives 2% to 3% royalty on generated revenues.
  • Existing Precious Metals Recovery division targets PV and e waste recycling.

THE NEXT OVERS

  • Patent applications remain pending in Europe and the United States.

  • £100,000 milestone payment applies upon pilot plant FID and commissioning.
  • £100,000 milestone payment applies upon first commercial sale.

Read full ASX Announcement here.

—————

Minrex Resources (ASX:MRR)

Tlamino Drilling Resets Barje Development Path

THE PLAY

  • Fully funded ~7,000m Tlamino drilling covers Barje infill and corridor testing.

  • Barje infill drilling targets conversion from foreign Inferred resources to JORC 2012 Indicated.
  • Barje Liska corridor drilling tests +1km of untested trend between both prospects.
  • Electrum merger completion sets Tlamino 2026 execution priorities.
  • Tlamino workstream directs 2026 expenditure and management focus to project development.

THE PITCH

  • Tlamino contains a foreign Inferred resource of 7.1 Mt at 2.5 g/t Au and 38 g/t Ag.

  • Barje hosts 570,000 oz gold and 8.8 Moz silver within 670,000 oz AuEq.
  • Barje and Liska sit 1.5 km apart in an interpreted genetically linked epithermal system.
  • Existing 2021 PEA foundation can be updated rather than rebuilt.
  • Existing cash reserves fund the full 2026 programme.

THE NEXT OVERS

  • Mobilisation remains imminent for ~3,200m Barje infill diamond drilling.

  • Phase 1 step out will test East and West Barje targets.
  • Scoping Study follows updated resource model, mine schedule and metallurgical performance.

Read full ASX Announcement here.

—————

Barton Gold (ASX:BGD)

Higher Grade Area 51 Drilling Expands Pit Scale

THE PLAY

  • Higher grade Area 51 drilling extended mineralisation beyond modelled pit boundaries.

  • TKB0492 returned 43m at 1.82 g/t Au from 39m.
  • Northern drilling delivered broader, shallower, higher grade mineralisation.
  • Southern drilling returned broader higher grade mineralisation at pit margins.
  • Phase 2 drilling validated models and indicated strike and depth extensions.

THE PITCH

  • Area 51 hosts an optimised open pit containing approximately 163,000oz gold.

  • Tunkillia OSS outlined ~120,000oz annual gold and ~250,000oz silver production.
  • S1 and S2 pits model ~$1.3bn operating free cash.
  • Barton is completing ~30,000m RC and ~3,000m diamond drilling programmes.
  • Tunkillia sits within Barton’s South Australian Gawler Craton portfolio.

THE NEXT OVERS

  • Phase 2 drilling will continue across Tunkillia pit areas.

  • Both drilling programmes target completion during June 2026.
  • Barton targets PFS completion before calendar year end 2026.

Read full ASX Announcement here.

The Day's Play Sponsor - Relait

Caprice Resources (ASX:CRS)

High Grade Gold Extends Beyond Vadrians Trend

 

THE PLAY

  • New drilling returned high grade gold across multiple Island targets.

  • Parallel structure returned 12m at 3.0 g/t including 5m at 5.8 g/t.
  • New Orient returned 10m at 2.6 g/t including 4m at 5.1 g/t.
  • Iron Clad returned 5m at 3.2 g/t and 4m at 3.1 g/t.
  • Results support mineralisation beyond Vadrians across BIF and Mafic units.

THE PITCH

  • Island is interpreted as a multi lode structurally controlled gold system.

  • Mineralisation occurs across BIF units and footwall Mafics beyond Vadrians.
  • Ongoing programme comprises 50,000m air core, RC and diamond drilling.
  • Gold mineralisation spans multiple targets within the Island Mining Licence.
  • Mineralisation remains open across strike, depth and parallel structures.

THE NEXT OVERS

  • Follow up RC drilling targets continuity around 22m at 66.2 g/t.

  • Drilling will test northern strike and depth extensions at Vadrians.
  • Further testing planned at New Orient, Iron Clad and emerging targets.

Read full ASX Announcement here.

—————

Stavely Minerals (ASX:SVY)

Open Pit Optimisations Reshape Thursday’s Gossan Development

THE PLAY

  • Open pit optimisations captured a large proportion of the 60Mt resource.

  • Scoping Study assessments expanded production scenarios to 5Mtpa throughput.
  • Development studies advanced operating cost estimates for a 3Mtpa facility.
  • Development studies progressed capital cost estimates for plant and mine infrastructure.
  • Second pass optimisations narrowed mining parameters using WA contract rates.

THE PITCH

  • Stavely hosts a 60Mt resource grading 0.58% CuEq.

  • Total resource contains 280,000t copper, 170,000oz gold and 5.4Moz silver.
  • Thursday’s Gossan and Cayley Lode sit within the 100% owned Victorian project.
  • Mincore Engineers and Entech Engineering lead optimisation and production scheduling.
  • Indicated Resources contain 58% copper, 63% gold and 63% silver.

THE NEXT OVERS

  • Second round optimisations will assess narrowed mining and throughput parameters.

  • Additional optimisation work will extend the Scoping Study timetable slightly.
  • Stavely expects to release the Scoping Study by mid year.

Read full ASX Announcement here.

—————

West Cobar Metals (ASX:WC1)

Scandium Recoveries Support Lower Cost Development Pathway

THE PLAY

  • Atmospheric leaching achieved up to 81% scandium recovery

  • Bioleaching extracted up to 39% scandium under atmospheric conditions
  • Results support lower cost scandium development pathways
  • Saprolite hosted mineralisation may offer processing advantages
  • Testwork supports separate scandium oxide production pathways

THE PITCH

  • Salazar hosts 15 Mt at 153 ppm Sc₂O₃ inferred resource

  • Portfolio spans scandium, REEs, gallium, alumina and TiO₂
  • Mineralisation occurs within shallow saprolite hosted clay systems
  • Rare earth resource totals 230 Mt at 1,178 ppm TREO
  • Deposit differs from laterite hosted Australian scandium projects

THE NEXT OVERS

  • Further bioleaching testwork planned

  • Ongoing metallurgical testwork program
  • Development studies across scoping and PFS pathways

Read full ASX Announcement here.

The Day's Play Sponsor - MPH Lawyers

Yugo Metals (ASX:YUG)

Every Maiden Erak Hole Intersects Gold System

THE PLAY

  • Every completed Erak maiden hole intersected mineralised gold bearing alteration.

  • ERDD002 returned 4m at 1.9 g/t Au from 105.1m.
  • ERDD003 cut 8m at 1.2 g/t AuEq from 26.1m.
  • ERDD006 intersected 34m alteration with all assays pending.
  • Mineralised alteration remains open along strike and down dip.

THE PITCH

  • Erak sits within Yugo’s 100% owned Sinjakovo Project in Bosnia and Herzegovina.

  • Five diamond holes completed 632m of maiden drilling at Erak.
  • Gold mineralisation occurs within phyllic altered breccia hosting disseminated pyrite.
  • Breccia mineralisation contains gold, silver, copper and antimony.
  • Alteration widths range from 3m western intercepts to 34m eastern intersections.

THE NEXT OVERS

  • Two drillholes will test strike extensions and northern down dip continuity.

  • Rig will relocate toward eastern Erak trenching of 61m at 1.5 g/t Au.
  • Pending assays are expected within approximately 6 to 8 weeks.

Read full ASX Announcement here.

—————

Antares Metals (ASX:AM5)

Multiple High Grade Gold Targets Emerge At Quinns

THE PLAY

  • Quinns sampling returned 41.7 g/t Au across newly confirmed gold workings.

  • Three priority drill targets moved directly into maiden drilling planning.
  • Finlay sampling identified 41.7 g/t Au across undocumented workings over 70m strike.
  • Fennell returned 15.93 g/t Au and 5.30 g/t Au across >130m strike.
  • Favourite mapping outlined >180m gold structure with surface results above 3 g/t Au.

THE PITCH

  • Quinns covers 383km2 within the Meekatharra greenstone belt in Western Australia.

  • Prior explorers focused on VMS copper zinc mineralisation, not orogenic gold potential.
  • Quinns sits ~10km from Burnakura Mill and ~50km from Westgold operating mills.
  • Gold mineralisation occurs within quartz veins linked to BIF and regional structures.
  • Antares controls a 20km belt largely untested by modern gold exploration.

THE NEXT OVERS

  • Heritage surveys will finalise targets before maiden Quinns drilling.

  • Expanded soil sampling will test targets across the 20km greenstone belt.
  • Geophysics review will define structural extensions beneath shallow cover.

Read full ASX Announcement here.