The Day’s Play Edition 68: ASX infrastructure and drilling updates | Logistics expansion, new gas sands, HMS scale and gold targets
Logistics control tightens ahead of first shipment in Cameroon, while ASX infrastructure and drilling updates capture new gas sands extending a well in Upper Austria and scale emerging across HMS and gold targets moving toward drilling.
Canyon Resources (ASX:CAY) increased ownership across rail and port infrastructure in Cameroon, strengthening logistics control ahead of first Minim Martap shipment in Q3 2026, ADX Energy (ASX:ADX) intersected six additional gas sands at HOCH 1 in Upper Austria, expanding reservoir potential ahead of imminent wireline logging and testing decisions, Tusker Minerals (ASX:TSK) confirmed high grade heavy mineral sands at Douala Basin in Cameroon, supporting scale ahead of a JORC Exploration Target and planned infill drilling, Mamba Exploration (ASX:M24) outlined a 20km gold anomalous trend at Meeka East, converting surface geochemistry into multiple drill targets across the project, Amplia Therapeutics (ASX:ATX) initiated an ovarian cancer study, extending narmafotinib into a second indication and broadening its clinical development pathway, Spenda (ASX:SPX) divested Ledger while retaining customers, reducing costs and simplifying the operating structure ahead of scaling its core platform, X2M Connect (ASX:X2M) signed a Mawson MoU, positioning for long duration estate contracts with integrated private 5G infrastructure capability.
Trading Halt Raising Capital: $GRE, $EVG
Runs on the Board: $AS1, $JLL, $AQN, $EGY
Selection Table: $CZR, $NUZ, $TGH
Canyon Resources (ASX:CAY)
Minim Martap Logistics Shift Toward First Shipment
|
|
Canyon tightened control of rail and port infrastructure as Minim Martap moves toward first production.
THE PLAY
THE PITCH
- Minim Martap holds a 144DMt Ore Reserve grading 51.2% Al2O3 and 1.7% SiO2.
- Minim Martap holds a 1,102Mt Mineral Resource grading 45.3% Al2O3.
- Port Access Agreement provides export rights for bauxite and alumina.
- Canyon now holds strategic positions across Cameroon logistics infrastructure.
- Seven locomotives are expected at Port of Douala in late Q2 2026.
THE NEXT OVERS
- Camrail transaction is expected to complete in Q2 2026.
- Rail wagons are scheduled to arrive in July 2026.
- Alumina refinery Feasibility Study is due in Q3 2026.
Read full ASX Announcement here.
|
|
|
|
ADX Energy Ltd (ASX:ADX)
Six New Gas Sands Shift HOCH 1 Upside
|
|
|
|
|
|
Tusker Minerals (ASX:TSK)
Douala HMS Dataset Sets Up Scale Test
|
|
|
|

Mamba Exploration (ASX:M24)
20km Gold Trend Sets Up Meeka East Drilling
|
|
|
|
|
|
Amplia Therapeutics (ASX:ATX)
Narmafotinib Opens Second Oncology Pathway
|
|
Amplia moved narmafotinib beyond pancreatic cancer through an ANZGOG ovarian study targeting patients with limited treatment options.
THE PLAY
THE PITCH
THE NEXT OVERS
Read full ASX Announcement here.
|
|
|
|
Spenda (ASX:SPX)
Ledger Sale Unlocks $7M Annualised Savings
|
|
|

X2M Connect (ASX:X2M)
X2M Targets 10 Year Estate Revenue Channel
|
|
|
|

|